Part Four – The Pre-Shift Meeting

published: 03 April 2012

Every working shift begins and ends with a pre-shift meeting, where production plans and results are discussed. What makes an important concern of such meetings is safety and detailed discussion of every violation, even of minor ones. This is a must for ensuring stable and safe operation.

[flashvideo filename=wp-content/uploads/video/En/04.flv image=”https://www.kumtor.kg/wp-content/uploads/2012/04/4b.jpg” /]

Previous publicationPart Five – Geologists, Drilling, Laboratory Next publicationPart Three – The Cam
© 2011-2023 "Kumtor Gold Company." Copying of materials is possible only with written permission.