SELECTION PROCESS FOR A LIMITED BIDDING FOR CARRYING OUT A COMPLEX OF WORKS RELATED TO THE ANALYSIS, PROCESSING AND INTERPRETATION OF MONITORING DATA FOR THE MILL TAILINGS DAM OF THE KUMTOR MINE DURING THE CONSTRUCTION AND OPERATIONAL PHASES IN 2027–2028

SELECTION PROCESS FOR A LIMITED BIDDING FOR CARRYING OUT A COMPLEX OF WORKS RELATED TO THE ANALYSIS, PROCESSING AND INTERPRETATION OF MONITORING DATA FOR THE MILL TAILINGS DAM OF THE KUMTOR MINE DURING THE CONSTRUCTION AND OPERATIONAL PHASES IN 2027–2028

published: 17 November 2026

SUBMISSION DEADLINE: no later than 5:00 pm (Bishkek time) on November 30, 2026.


Kumtor Gold Company CJSC invites to take part in the selection process for a limited bidding for carrying out a complex of works related to the analysis, processing and interpretation of monitoring data for the Mill tailings dam of the Kumtor mine during the construction and operational phases in 2027–2028.

Submission format: Bid Submission for participation and other documents shall be signed by a person authorized to sign bids and contractual obligations. Documents shall be stamped and submitted in PDF format. Signatory authority shall be confirmed by the power of attorney or by certified copies of the relevant documents.
Procedure for submitting proposals: Bid Participants shall submit their proposals for participation in Russian in accordance with the Bidding requirements, attach the required copies of documents, and send them electronically to [email protected] no later than 5:00 pm (Bishkek time) on November 30, 2026.

The Terms of reference shall be provided to participants who have signed confidentiality agreements.

For residents:

 

 

Proposal for participation shall include the following documents:

– A letter confirming interest in participating in the competition; the application form is attached (Appendix 2);

– Experience of implementing projects in the mining industry will be an advantage in the selection of a contractor.

– Experience of carrying out similar monitoring work on earthen tailings dams and other facilities

A reference list detailing similar projects carried out involving the monitoring, analysis and interpretation of geotechnical monitoring data for dams, tailings storage facilities or other hydraulic structures, specifying the client, the period during which the work was carried out and contact details to verify the information.– A scanned copy of the legal entity’s registration certificate;

– Scanned copy of the document defining the main type of activity (the Charter), as well as scanned copy of the decision on the appointment of the Head of the Company.

– Certificate of absence of arrears in tax payments and insurance contributions to government agencies as of the last reporting date.

– Scanned copies of the 2024-2025 original financial statements.

·     Accounting balance sheet.

·     Profit and loss statement.

·     Cash flow statement.

·     Changes in equity statement.

·     Or the 2024-2025 unified tax declaration.

–          Possession of a valid license to perform construction and installation work, issued by an authorized body (Level II license);

–          Recommendations and references regarding the performance of previous contracts;

–          A declaration of good faith; the form is attached (Appendix 3)

–          Information about employees, including a description of their work experience. Form is attached (Appendix 4)

–          Non-disclosure agreement (sign and submit a scanned copy) (Appendix 5)

For non-residents:

– A letter confirming interest in participating in the competition; the application form is attached (Appendix 2);

Experience of implementing projects in the mining industry will be an advantage in the selection of a contractor.

– Experience of carrying out similar monitoring work on earthen tailings dams and other facilities

A reference list detailing similar projects carried out involving the monitoring, analysis and interpretation of geotechnical monitoring data for dams, tailings storage facilities or other hydraulic structures, specifying the client, the period during which the work was carried out and contact details to verify the information.

– A scanned copy of the legal entity’s registration certificate;

– Scanned copy of the document defining the main type of activity (the Charter), as well as scanned copy of the decision on the appointment of the Head of the Company.

– Document confirming financial stability for 2024–2025.

– Recommendations and references regarding the performance of previous contracts;

–   A declaration of good faith; the form is attached (Appendix 3)

–  Information about employees, including a description of their work experience. Form attached (Appendix 4)

–  Non-disclosure agreement (sign and submit a scanned copy) (Appendix 5)

– Possession of a valid license to perform construction and installation work, issued by an authorized body (Level II license);

Non-disclosure agreement (sign and submit a scanned copy) (Appendix 5)

Requirements for electronic files: Maximum email size: up to 25 MB.

If this limit is exceeded, the files shall be divided into separate parts and specify as follows:

“Qualification and Technical Proposals (Participant’s Name) – Part 1”, “… – Part 2”, etc.

Submission of documents via cloud-based links is prohibited.

Evaluation criteria: Bid Proposal shall be deemed to have passed the pre-qualification stage, if it fully complies with all qualification requirements and includes the complete package of requested documents.
Proposals for participation with “Manufacture, delivery, and installation of leaching tank # 3 at the Kumtor Mine Mill” in the subject line shall be sent to the email address to [email protected] no later than 5:00 pm (Bishkek time) on November 30, 2026.
The Client shall reserve the right to accept or reject any or all proposals, as well as to cancel the selection process at any time prior to the award of the Agreement, without incurring any obligations to the relevant participants.
Proposal shall be submitted on official letterhead.
Bid Submissions submitted by Participants after the specified deadlines shall not be accepted or considered.

By submitting its Proposal, the Participant expressly agrees to all the terms and conditions specified in the Company’s requirements.

Each Participant can submit only one Bid Proposal.

Validity period of the Proposal shall be at least 60 calendar days.

No amendments to Bid Proposals shall be permitted during the validity period of the Proposal.

All questions regarding this pre-qualification process and requests for clarification of its terms shall be emailed to [email protected] at least 3 calendar days before the proposal submission deadline.

 

ALL FILES